|
|

#1
Comes with everything needed for easy application.
#3
Cut off cartridge tip and dispense material until it flows VERY
EASILY!
#5
Begin applying material at top of coverage area on shoe. Let gravity
help material flow down shoe.
#7
Once application is finished continue to rotate shoe 5 minutes
so material doesn't drip or run. Let cure for 24 hours.
|
|

#2
AGGRESSIVELY sand the surfaces you want to coat
#4
Put mixer tip on cartridge and dispense a 2-3 inch line before
applying.
#6
Use stick to smooth material where you want it within 2 minutes
of application. Remove any masking tape immediately after TT application

|